2013 ToDo List



  • Engine maintenance: (Heat Exchanger / Alternator / Fluids)
  • Tackle electric issues: (GPS / Chart Plotter / Radar / Low power at VHF)
  • Prep Bottom / Paint
  • Wax & buff hull
  • Inspect steering linkage
  • Hook up fuel gauge
  • Install new 30amp Shore power receptacle
  • Install LEDs in salon (Need catalina fuse panel first)
  • Replace main halyard & Topping Lift
  • Install self tailing Winch on mast for main halyard
  • Manufacture Cockpit cushions
  • Non-skid on Dink floor & Paint Reg numbers
  • Caulk Toerail
  • Re-mark Anchor chain
  • Seal top left interment panel
  • Re-Seal all port lights
  • Rudder Attention
  • Seal old propane locker vent
  • Spray foam ice boxes.
  • Install Rod holders
  • Counter top project
  • Boarding ladder/step project
  • Refinish Teak (and boarding steps)
  • Install Stern Gate
  • Paint stern locker floor


  • Slim from SKS marine:

    - new fuel gauge & sending unit.
    - cleaned heat exchngr. (clogged & cruddy)
    - drained cooling jacket / cleaned / replaced antifreeze.
    - drained fuel / water sep bowl.
    - need to return to replace blower. (wrong size)
    - replaced fuel filter. (5/4/13)

    *** need to replace battery cables w/ higher gauge. (tested w/ jumpers from bat 1 to starter... turned over much faster)
    *** low power number 1 bat

    Finished Stern gate and Helm Cover Zipper project:
    - stern pulpit a little less rigid, but not bad when gate is closed.
    - Dudly Bycott installed new zipper on helm cover.

    No comments:

    Post a Comment