Engine maintenance: (Heat Exchanger / Alternator / Fluids)
Tackle electric issues: (GPS / Chart Plotter / Radar / Low power at VHF)
Prep Bottom / Paint
Wax & buff hull
Inspect steering linkage
Hook up fuel gauge
Install new 30amp Shore power receptacle
Install LEDs in salon (Need catalina fuse panel first)
Replace main halyard & Topping Lift
Install self tailing Winch on mast for main halyard
Manufacture Cockpit cushions
Non-skid on Dink floor & Paint Reg numbers
Caulk Toerail
Re-mark Anchor chain
Seal top left interment panel
Re-Seal all port lights
Rudder Attention
Seal old propane locker vent
Spray foam ice boxes.
Install Rod holders
Counter top project
Boarding ladder/step project
Refinish Teak (and boarding steps)
Install Stern Gate
Paint stern locker floor
Slim from SKS marine:
- new fuel gauge & sending unit.
- cleaned heat exchngr. (clogged & cruddy)
- drained cooling jacket / cleaned / replaced antifreeze.
- drained fuel / water sep bowl.
- need to return to replace blower. (wrong size)
- replaced fuel filter. (5/4/13)
*** need to replace battery cables w/ higher gauge. (tested w/ jumpers from bat 1 to starter... turned over much faster)
*** low power number 1 bat
Finished Stern gate and Helm Cover Zipper project:
- stern pulpit a little less rigid, but not bad when gate is closed.
- Dudly Bycott installed new zipper on helm cover.
No comments:
Post a Comment